Anodized Mounting Rail Splice for solar railings connecting clamp pv Mounting system solar panel roof
- Minimal order
- 100 pieces
Message Phone call
Product Specifications
--
Product Description
Overview
Quick Details
Place of Origin: China
Brand Name: OEM Rail kit solar panel roof
Model Number: Rail Splice for Solar Mounting Rail
Wind Load: Up to 60m/s
Snow Load: solar panel bracket
Product name: Rail Splice for Solar Mounting Rail
PV module: Unframed/ frameless, thin film/ double glass
Material: Anodized Aluminum stainless Steel
Mounting Type: Roof/Ground Mounting
Module Orientation: Landscape , Portrait
Certificate: AS/NZS1170.2:2011 (R2016), JIS C 8955:2017s
Package: Carton steel case
Usage: Support Solar Modules
Installation Site: Solar Energy Station
Function: Rail Connecting solar mount
Supply Ability
Supply Ability: 10000 Set/Sets per Month
Packaging & Delivery


Anodized Mounting Rail Splice for solar railings connecting clamp pv Mounting system
Feature:
Application: Rail Splice Kit
Wind speed: Up to 60m/s
Module Orientation: Landscape , Portrait
Material: Stainless steel 304
Standard: AS/NZS1170.2:2011 (R2016), JIS C 8955:2017s
Introduction:
Solar rail connecting splice








| Standard | AS/NZS1170.2:2011 (R2016), JIS C 8955:2017s |
| Material | Anodized aluminum 6005-T5, EPDM rubber |
| Install Site | Roof/ Ground |
| Wind Speed | Up to 60m/s |
| Colour | Anodized silver/ Electrophoresis black |
Related Products


Company Information

Factory Overviews



Product Uses

FAQ


1.Q: Are you trading company or manufacturer ?
A: We are factory, welcome to visit our factory at any time.
2.Q: How long is your delivery time?
A: Generally it is 5-7 days if the goods are in stock. 15-20 days if the goods are not in stock, it is according to quantity.
3.Q: Do you provide samples ?
A: Yes, we could offer the sample with the best discount.
4.Q: What is the MOQ ?
A: We don't have MOQ for first order.
5.Q: What is your terms of payment ?
A: Payment<5000USD, 100% in advance. Payment≥5000USD, 30% T/T in advance ,balance before shippment.




Supply Ability
--
Packaging and Shipping
Lead time
--
Port
--
Packaging details
--








