SMC MOULD High Speed Rail Side Roof
Mould starts only when mould lay out approved and down payment received.
Mold schedule:
The time of design has not included the time of validation by Buyer.
The Off tools date is from the 2D assembly drawing validated by buyer.
About trial out:
This price includes 2 trial (2*5 parts ).
The tryout material should be provided by buyer with DDP terms.
Additional costs and shipments to adjust the mould will be the responsability of the buyer.
Delivery point:FOB NINGBO/SHANGHAI
Tool inspection is in SUASE Mould.
Payment terms: 40% down payment,30% on T1,30% after parts are approvaled by buyer before shipping.