KXD706A Factory Direct Selling mini dirt bike petrol 49CC 2 stroke Off-road nylon easy pull start cheap price kids bike
- Minimal order
- 100 pieces
Message Phone call
Product Specifications
Max Speed
Other
Engine Capacity
<50CC
Engine
Other
Certification
CE
Product Description
Overview
Quick Details
Displacement: <50CC
Max. Speed: < 40km/h
Brand Name: KXD MOTO
Place of Origin: China
Model Number: KXD706A
Product Name: mini dirt bike
Engine: 2 Stroke Air-cooled
Color: Black red green orange
Transmission: Chain Drive
Supply Ability
Supply Ability: 5000 Piece/Pieces per Month
Packaging & Delivery
KXD706A Factory Direct Selling mini dirt bike petrol 49CC 2 stroke Off-road nylon easy pull start cheap price kids bike
Engine:49CC,single cylinder,two stroke,air cooling |
Starter system:easy pull start |
Transmission:chain drive |
Brake system:disc brake |
Front suspension:invert telescopic frok |
Rear suspension:alloy mono shock |
Fuel type:≥1:25(oil:petrol) |
Seat height:60cm |
Max speed:40KM/H |
Max load:80KG |
Gas tank capacity:2.2L |
Tyre(F/R):2.5-10 |
NW/GW: 22/26KG |
Carton size (L*W*H):110*30*53.5cm |
Vehicle size(L*W*H):120*56*78cm |
Container quantity:148pcs/20ft;346pcs/40HQ |
Available color:red,blue,orange,green,yellow,white |
Packaging & Shipping
Company Information
KXD service
1. OEM Manufacturing welcome: Product, Package...
2. Sample order acceptable
3. We will reply you for your questions or inquiry in 8 hours.
4. We will delivery the urgent service parts within 3 days.
5. We will delivery your order within 30 days
FAQ
Q1: What is the price of your products ?
A : Pls contact with our sales for detailed offer( Dylan Sun service for you directly)
Q2: What is your term of payment ?
A: As usual 30% TT as deposit , 70% on before loading or BL copy, or LC at sight.
Q3: What is the term of your packing ?
A : Carton Box with Steel Frame Inside , design for container loading and special wood packing for some type..
Q4: What is your delivery time ?
A : Normally 25-30 days after deposit .
Q5: What is your warranty time ?
A : 12 months for most component of the vehicles .
Q6: Can you do OEM Brand ?
A: yes , can be negotiable.
Supply Ability
--
Packaging and Shipping
Lead time
--
Port
--
Packaging details
--