Asphalt beautiful color coating cold mix colored asphalt bitumen asphalt
- Minimal order
- 100 pieces
Message Phone call
Product Specifications
--
Product Description
Overview
Quick Details
Place of Origin: Shanghai, China
Brand Name: Go Green
Model Number: GCA01
Type: Petroleum Asphalt
Grade: Top Grade
Softening Point: N/M
Color: Red, Yellow, Green, Blue, Orange etc
Package: 20kg bag, 1 ton bag
Application: Landscape, bicycle lane, footpath etc light traffic driveway
Paving Thickness:: 1.0-1.5 cm
Supply Ability
Supply Ability: 10000 Ton/Tons per Week
Packaging & Delivery
Go Green Cold Mix Colored asphalt is a new patented high technology product, uses eco-friendly cold mix processing and significant ultra thin overlay technology, the material can be storaged and shelf life unopen up to six months. It's suitable for landscaping paving, sport and leisure, public parks and gardens, bicycle path as well as light traffic driveway paving. The paving thickness is only 1.0-1.5cm, which greatly reduce the material cost.
Different color avaiable
Outstanding Features
Go Green Micro-Paving Cold Mix Color Asphalt has some basic performances such as soft, easy to compact, water stability, long shelf time, excellent strength, construction at normal temperature, they are generally described as follows:
A. Cold mix technology. Paving thickness only 1.0-1.5cm.
B. Noise reduction, Anti-slip and Fog-proof.
C. Stick to the original pavement surface closely
D. Storage up to 6 month
E. Excellent resistance to water damage.
F. Environmental Protection
G. Construction time no limitation.
H Different color available, lively colors protection
Application Area
Step one:
Preparation
1. The product construction temperature should be above 0°C, recommend to construct above 5 °C
2. Clean the Debris of the road. The surface should be free of ice, standing water, snow, and loose material.
Step two:
Paving 1.0-1.5cm thickness by standard asphalt paver.
Step Three:
Compact the surface as soon as possible, after 1-2 hours, compact 4-5 times to guarantee the compaction without crashing aggregate.
Step Four:
Close traffic completely after construction. till pavement surface is dry and hard, depends on the weather, usually open to traffic after 6-12 hours.
Package are available in 20kg bag and 1 ton bag
Company Information
Certifications
Our Market
Our Services
Contact us
Welcome to contact us, or call us 021-61053027, we will reply to any of your question at the earliest time.
Supply Ability
--
Packaging and Shipping
Lead time
--
Port
--
Packaging details
--