zddshop
/
Product
/
Solar Energy Products
/
Bangzhao off grid wind system charge controller with 3 phase dump load

Bangzhao off grid wind system charge controller with 3 phase dump load

$500 /piece price excl.VAT

Negotiable
Order

Minimal order
100 pieces

Message Phone call

Product Specifications

--

Product Description

Overview

Quick Details

Place of Origin: Zhejiang, China

Brand Name: BANGZHAO OR OEM

Model Number: BZW-20KW-360V

Type: PWM

Application: Charger Controller, Wind Controller, Solar Working Station, Voltage Controller, Solar System Controller

Work Time (h): 7-10 working hours

Max PV Power: can be customize

Max PV Voltage: can be customize

Certificate: CE

Warranty: 1-3 YEAR OPTIONAL

wind turbine: 20000W

Phase: Three Phase

Current Type: DC

Usage: battery charger

Supply Ability

Supply Ability: 8888 Piece/Pieces per Year Bangzhao off grid wind system charge controller

Packaging & Delivery

Bangzhao off grid wind system charge controller with 3 phase dump load

 

  • The product is manufactured according the JB/T6939.1-2004 industrial standard and GB/T 19115.1-2003 national standard also with users’ technical requirements.
  • The big screen LCD display. Clearly present the working status of the wind turbine, solar panel, battery and controller.(Wind turbine voltage, current, power; battery charging current, voltage.)
  • Two sets of control systems:PWM constant voltage system and three-phase dump load system.
  • PWM constant voltage control is 120% of the rated power of the wind turbine. In case exceeding of PWM’s capacity, the three-phase dump load will automatically start immediately to ensure safe running of the overall wind turbine system.
  • When the battery disconnect or damage, the three-phase dump load will start automatically to avoid the wind turbine idling and runaway accident.
  • When the strong or super-strong wind conditions PWM control to ensure battery charged by the wind turbine with constant voltage and current.
  • The protection function of battery: polarity reverse protection, disconnection and damage protection.
  • Over-charging protection of the battery: When the battery is full (the battery voltage getting 125% of the rated voltage), the controller will carry out three-phase dump load automatically to stop charging the battery.
  • Auto recharging of battery: When the battery voltage reduces to 108% of the rated voltage,it stops three-phase dump load to recharge battery automatically.
  • For the different wind turbine type, the controller can be equipped with mechanical yawing, furled empennage, mechanical or hydraulic, pneumatic, electric magnetic and other brake functions.
  • The inside of the controller is equipped with surge arrester. Contain the over voltage into the wind turbine under the bearable voltage of the equipment or system. On the other way, to conduct the strong lightening current into the earth directly to avoid any damage of equipment.
  • The controller is equipped with manual three-phase dump load switch. To using this switch, the wind turbine will carry out three-phase dump load forcibly.
  •  Optional communication Mode:RS232,RS485,GPRS,USB,RJ45 ect, Can monitor multiple devices running.

  

Type

20KW-360Vdc

Wind turbine rated power

20KW

Wind turbine max. power

40KW

Battery

360Vdc

Function

Rectifier,charge, control

Display mode

LCD

Display content

Wind turbine voltage, wind turbine current, wind turbine power,

battery voltage, charge current

PWM constant pressure voltage

>420Vdc

3-phase load voltage of the wind turbine

435±5Vdc

Recovery charging voltage of the wind turbine

405±5Vdc

Low-voltage of the battery

300±5Vdc

Self-provided connecting wire of the battery

>12mm²

PWM fuse

40A

Charging fuse

80A

Work environment temperature

-30-60°C

Relative humidity

<90% No condensation

Noise(1m)

<40dB

Degree of protection

IP20(Indoor)

Cooling method

Forced air cooling

*Communication interface (optional)

RS485/USB/GPRS/Ethernet

*Temperature compensation(optional)

-4mv/°C/2V,-35°C~+80°C,

Accuracy:±1°C

Size of the controller

560*460*950 mm

Weight of the controller

53 Kg

Size of the load

810*580*980mm

Weight of the load

77Kg

 

*Above parameter only for reference

1. Could be custom made to user specifications.  2, Could have solar power control subject to user demand. 

 

Bangzhao off grid wind system charge controller with 3 phase dump load from China supplier

Product Show

Bangzhao off grid wind system charge controller with 3 phase dump load from China supplier 

 

Certifications

Bangzhao off grid wind system charge controller with 3 phase dump load from China supplier

Company Information

Bangzhao off grid wind system charge controller with 3 phase dump load from China supplier 

Our Services

 

Q 1. What's the payment term?  

A. We accept TT,Western Union,Paypal,MoneyGram.

 

Q 2.How's the delivery time ?

A. Is due to order quantity, usually it will take about 3-7days for sample production,

Q 3.Tell me the standard of package?

A. For the small capacity, it use carton, but for big capacity, we should use honeycomb carton and pallet or  wooden case for protection.

 

Q 4.Would you accept to use our logo ?

A.It's no problem to do OEM.

Q 5.We want to know month capacity.  

A. It depends on which model.For example for relay type small capacity , month capacity can reach near 2000pcs  and big capacity near 500pcs.

Q 6.Where is your market?

A. Our products are popular in Australia,South America,Philippines,Italy, America, Pakistan and so on.Some of them are our regular customers and some of them are developing. We hope you can join us and make mutural benifit from our cooperation.

Q 7. What kind of certificate you have ?

A. Our company already achieve ISO9001, and for products, we have CE, SAA, G83 G59 etc .

 

Q8. What is the warranty period ?

A. Normally 1 year ,if order quantity enough can be extended to 5 years.

 

Q 8.How about the lifetime?

A:The life time for inverter is 15-20years.

 

OEM Services

1.Logo

Please offer us your own high resolution logo in JPG format,there should be two colors at most in the logo and there should be no gradient effect in the logo.

2.Label

Please offer us your own model numbers.

3. Manual

Please offer us the finished manual file that can be printed directly.

 

Lead Time

1.Sample orders will be delivered from our factory within 3-7 working days.

2.General orders will be delivered from our factory within 15-30working days.

3.Big orders will be delivered from our factory within 45 working days at most

 

Shipment

1.By EMS,DHL,FedEx,TNT,UPS or other express.

2.By our forwarding agent(by air or by sea).

3.By your own forwarding agent.

4.By domestic forwarding agents to any city in China.

 

Why Choose Us

Bangzhao off grid wind system charge controller with 3 phase dump load from China supplier 

Contact Information

Bangzhao off grid wind system charge controller with 3 phase dump load from China supplier 

Supply Ability

--

Packaging and Shipping

Lead time

--

Port

--

Packaging details

--


Comments
Welcome to zddshop comments! Please keep conversations courteous and on-topic. To fosterproductive and respectful conversations, you may see comments from our Community Managers.
Sign up to post
Sort by
Show More Comments

Other offers of this wholesaler

Copyright 2023-2026 - www.zddshop.com All Rights Reserved